1. This type can be rotated for 360 degrees which
can solve the problems of the rope twisting and
difficulty in rotation during the work.
2. The winching part changes the disadvantage of
the short lifespan of the turbine reducer to make
the electromagnetic braking motor much more
powerful.
.
3. The electricity type is designed with the clutch
device to win the fast speed when falling down to
improve the efficiency.
4. The most important is that the rotation part is
installed with the automatic positioning device
which will be much more safe.
Being a highly effective, lean and fast-moving organization, we are highly
instrumental in providing an extensive array of Mini Construction Crane. The offered
construction
crane is available in different sizes, designs and specifications in compliance with
industry norms.
So as to offer a qualitative product to our valuable
clients, we stringently test this construction crane against various parameters.
# | Model | Specifications |
---|---|---|
1 | 500kg, 30m wire rope, 220V, Clutch | 1.Single rope is 30m, Rated load is 200kg, Speed is 14m/min. 2.2200W,220V,50HZ. 3. Continuous working time:2hours. 4.Rope dia:8mm 5.Clutch and brake are integrated |
2 | 500kg, 30m wire rope, 220V | 1.Single rope is 30m, Rated load is 200kg, Speed is 14m/min. 2.Power:2200W, 220V,50HZ. 3. Continuous working time:2hours. 4.Rope dia:8mm |
# | Model | Specifications |
---|---|---|
1 | 1000kg, 60m wire rope, 220V, Clutch | 1.Single rope is 60m, Rated load is 300kg, Speed is
14m/min. 2.Double rope is 30m, Rated load is 500kg,Speed is 7m/min. 3.2200W,220V,50HZ. 4.Continuous working time:2hours. 5.Rope dia:6mm 6.Clutch and brake are integrated |
2 | 1000kg, 60m wire rope, 220V | 1.Single rope is 60m,
Rated load is 300kg, Speed is 14m/min. 2.Double rope is 30m, Rated load is 500kg, Speed is 7m/min. 3.Power: 2200W,220V,50HZ. 4.Continuous working time:2hours. 5.Rope dia:6mm |